Harmony School of Innovation - Dyer Campus

PROJECT         HARMONY SCHOOL OF SCIENCE MIDDLE & HIGH                                  SCHOOL - JOE BATTLE CAMPUS 
                        EL PASO, TEXAS 

CLIENT            HARMONY PUBLIC SCHOOLS
SIZE                 88,350 SF  -  NEW CONSTRUCTION
ARCHITECT     GIGNAC ARCHITECTS 

AUGMENTING THE EXISTING ELEMENTARY SCHOOL IN THE SAME BLOCK, THIS PROJECT SAW THE RISE OF HARMONY'S ALL-NEW MIDDLE AND HIGH SCHOOL IN FAR EAST EL PASO. AZTEC HAD PREVIOUSLY BUILT THE DYER CAMPUS FOR THIS REPEAT-CLIENT.

 

Excellent Client Rating-02-02-02
Harmony School of Science Middle & High School - Joe Battle Campus
Public
Coach Archie Duran Elementary School
Public
SISD Auxiliary Gyms
Educational
Dr. Joseph Torres Elementary School
Educational
Untitled-1-01
VLK-1024×453

 "VLK HAS WORKED WITH MANY CONTRACTORS AND AZTEC HAS PROVEN TO HAVE THE CAPACITY TO PERFORM AND DELIVER AS PROMISED AND DEMONSTRATED STRONG WORK ETHICS AT ALL LEVELS THROUGHOUT THE PROJECT."
— ADRIAN K. STRESOW, P.E.

JMT LOGO

"THE LEVEL OF INVOLVEMENT FROM THE PRESIDENT OF THE COMPANY ALL THE WAY TO THE ON-SITE WORKERS WAS TRULY IMPRESSIVE AND IS REFLECTIVE OF A CULTURE OF COOPERATION AND HARD WORK."
— PAULO PERES, AIA, LEED AP 

LOI_Logo_Final-2

"LOI ENGINEERS KNOW EXCELLENCE IN CONSTRUCTION PROJECTS, AND AZTEC CONTRACTORS IS A TRUE EXAMPLE OF EXCELLENCE." 
— BERNARDINO OLAGUE, P.E., PMP., M.SC.

Untitled-1-01
Aztec-logo-2022-2

4509 Osborne Dr.,

El Paso, Texas 79922

(915) 577-9685

For inquiries, please e-mail:

info@azteccontractors.com

© 2024 AZTEC CONTRACTORS, INC. ALL RIGHTS RESERVED.