Aztec Contractors, Inc. served as the Prime Contractor for this Multi-Phase project which required the retro-commissioning of nine (9) existing buildings at Dyess AFB, TX.
The project consisted of executing light repairs and implementing operational and maintenance enhancements to improve energy efficiency, occupant comfort, indoor air quality, and site studies and investigations. Other scope included repairs and adjustments for improved sensor calibration, piping and duct systems, flex duct reconnections, operation/control parameters, building pressure, sequence or set points, and temperature devices.